facebook  google plus  twitter
WynndelIrrigationDistrict/wynn2_1510789808.png

Wynndel Irrigation District

2017

Wynndel Irrigation District

Calhoun CC Series
32’ x 64’ with 8' Bay Spacings
  1.      Supply and Installed
  2.      Fully enlcoded and full lined
  3.      Man doors and ventilation
  4.      Engineering
  5. Meets NSF 61 requirements 
Purpose: Potable Water Cover
BBEManitobaHydro/bbe_1510791631.png

BBE Manitoba Hydro

2017

BBE Manitoba Hydro

Calhoun VPR Series
60’ x 64’ with 16' Bay Spacings
  1.      Supply Only
  2.      Fully enlcoded and full lined with steel studs and Ayrfoil A2V
  3.      Man doors
  4.      Engineering
Purpose: Bus Shop 
SiteC-QualityLab/lab_1_1510779873.png

Site C - Quality Lab

2017

Site C - Quality Lab

Steel Building 84' x 117' with lean to
  1. Design and Install
  2. Insulation
  3. All doors, snow bars, stnding seam roof
  4. Full wrap windows
  5. Gutters and downspouts
  6. Pile foundation
Purpose: Quality Testing Lab
FortMcMurrayGolfCourse/fmg4_1510789596.png

Fort McMurray Golf Course

2017

Fort McMurray Golf Course

Steel Building 60' x 160' with lean to
  1. Design and Install
  2. Insulation
  3. All doors and overheads
  4. Gutters and downspouts
  5. Design to fit an exsisting foundation
Purpose: Shop and Equipment Storage
TrailRegionalAirport/tra9_1522163048.png

Trail Regional Airport

2017

Trail Regional Airport

Steel Building 70' x 60' - Custom Design
  1. Design and Install
  2. Insulation and fully lined
  3. Standing seam roof, snow bars, roof stacks
  4. All doors and overhead openings with trim
  5. Custom canopies
  6. Valley gutters
  7. Custom panel design
  8. Gutters and downspouts
  9. Design to fit an exsisting foundation
Purpose: Regional Terminal Building
Fortis-WanetaDam/img_8234_1510790450.jpg

Fortis - Waneta Dam

2017

Fortis - Waneta Dam

Steel Building 40' x 50' 
  1. Design and Install
  2. Insulation and fully lined
  3. Standing seam roof, snow bars
  4. All doors and overhead openings with trim
  5. Custom canopies
  6. Gutters and downspouts
Purpose: WAX Storage Building
BaseMetLab/base_copy_1510791320.png

Base Met Lab

2017

Base Met Lab

Steel Building 60' x 100' - Single Slope
  1. Design and Supply
  2. Insulation and fully lined
  3. Standing seam roof, snow bars
  4. All doors and overhead openings with trim
  5. Custom canopies
  6. Valley gutters
  7. Custom panel design
  8. Gutters and downspouts
Purpose: Laboratory
KluskusFirstNations/kfn3_copy_1510790857.png

Kluskus First Nations

2017

Kluskus First Nations

Calhoun CC Model
52’ x 80’ with 8’ on center bay spacing
  1.        Turn Key (Foundation mounting → Construction)
  2.        Including custom wood build up for flare out
  3. Open concept
  4. All engineering
Purpose: Public Events and Storage
es3_1510791118.png

Merritt BC Arena

2017

Merritt BC Arena

Calhoun CC Model
52’ x 96’ with 12’ on center bay spacing
  1. Supply - Customer Build
  2. 5’ block wall
  3. Fully enclosed
  4. All engineering

Purpose: Indoor Riding Arena