facebook  google plus  twitter
Fortis-WanetaDam/img_8234_1510790450.jpg

Fortis - Waneta Dam

2017

Fortis - Waneta Dam

Steel Building 40' x 50' 
  1. Design and Install
  2. Insulation and fully lined
  3. Standing seam roof, snow bars
  4. All doors and overhead openings with trim
  5. Custom canopies
  6. Gutters and downspouts
Purpose: WAX Storage Building
BaseMetLab/base_copy_1510791320.png

Base Met Lab

2017

Base Met Lab

Steel Building 60' x 100' - Single Slope
  1. Design and Supply
  2. Insulation and fully lined
  3. Standing seam roof, snow bars
  4. All doors and overhead openings with trim
  5. Custom canopies
  6. Valley gutters
  7. Custom panel design
  8. Gutters and downspouts
Purpose: Laboratory
Hydro-Dawson/bc_hydro1_1510775712.jpg

BC Hydro - Dawson Creek

2013

BC Hydro - Dawson Creek

Guard-All Centurion Model C36 18’leg
40’x 60’ with 20’ on center bay spacing
  1.       Trun Key (Foundation → Construction))
  2.       Fully lined (insulated)
  3.       Vents, Fans and Control Systems
  4.       Overhead and Personnel Doors
Purpose: Temperature controlled storage facility
MountPolley/mp1_1510775775.jpg

Mount Polley - Explosion Building

2013

Mount Polley - Explosion Building

Steel Building 
40’x 60’ with 20' Eaves
  1.      Supply and Install (Doors, etc)
  2.      Fully Lined and insulated
Purpose: Explosion building for dangerous product
walter/img_4462_1510775633.jpg

Walter Energy

2013

Walter Energy

Fabric Building Extension Design -  62' x 160' with 40' extension
  1. Extension
  2. Cables and straps
  3. Insulation
grandForks/gf_finished-9_1510775423.jpg

Grand Forks

2012

Grand Forks

Guard-All Heritage Model H21 8’leg
33’x 48’ with 16’ on center bay spacing
  1.       Turn Key (Foundation → Construction)
  2.       One Ended
  3.       Plywood lined for functionality
  4.       Passive vents
  5.       Back addition to cover extra material
 Purpose: To cover salt/sand material for roadway maintenance
StTomMore/stm1_1510775355.jpg

St. Thomas More

2012

St. Thomas More

Guard-All Centurion Model C36
50’x 84’ with 14’ on center bay spacing
  1. Turn Key (Foundation  → Construction)
  2.       Fully enclosed
  3.       Radiant Heat
  4.       Ventialtion system
Purpose: To provide temporary gym while the school was being renovated
riverside/img_5211_1510775256.jpg

Riverside Equipment

2015

Riverside Equipment

Guard-All Heritage Model H21
43’x 40’ with 10’ on center bay spacing
  1.        Turn Key (Foundation mounting → Construction)
  2.        Including building extension
  3. Overhead doors
  4. sea can flare out
Purpose: To cover machinery and covered working area
TOL/tol_1_1510778535.png

Township of Langley - Power Wash

2015

Township of Langley - Power Wash

Cover-All TBS4 
120’ x 195’ with 13’ on center bay spacing
  1.        Powerwashed entire surface 
Purpose: Covered Lacross Field
KluskusFirstNations/kfn3_copy_1510790857.png

Kluskus First Nations

2017

Kluskus First Nations

Calhoun CC Model
52’ x 80’ with 8’ on center bay spacing
  1.        Turn Key (Foundation mounting → Construction)
  2.        Including custom wood build up for flare out
  3. Open concept
  4. All engineering
Purpose: Public Events and Storage
es3_1510791118.png

Merritt BC Arena

2017

Merritt BC Arena

Calhoun CC Model
52’ x 96’ with 12’ on center bay spacing
  1. Supply - Customer Build
  2. 5’ block wall
  3. Fully enclosed
  4. All engineering

Purpose: Indoor Riding Arena

ResearchDepartment/teckresearch1_1510774842.jpg

Teck Metals - Research Department

2012

Teck Metals - Research Department

Steel Building with 14' Eaves
30’x 40’ with 14’ eaves
  1.        Supply Only
  2.        R-40 roof and wall insulation
  3.        Full vapor barrier and sealing system to maintain very cold temperatures
  4.        Industrial strengt gutter system
  5.        3 bar snow shed safety system
 ** Actual photo cannot be provided due to privacy agreements with Teck Metals, Trail Operations
EandM/eandm_1510774776.jpg

Teck Metals - E and M

2012

Teck Metals - E and M

Guard-All Centurion Model C36 12’6” leg
36’x 42’ with 14’ on center bay spacing
  1.       Turn Key (Foundation → Construction)
  2.       5’ block wall
  3.       Open ended
  4.       Sealed with flashing to existing main structure
** Actual photo cannot be provided due to privacy agreements with Teck Metals, Trail Operations
Warehouse/_4shed2_1510774738.png

Teck Metals - Warehouse #4

2012

Teck Metals - Warehouse #4

Guard-All Centurion Model C48 26’leg
70’x 140’ with 20’ on center bay spacing
  1. Turn Key (Foundation → Construction)
  2.       Water sealed foundation with 5’ block wall
  3.       Side portal entry
  4.       TNR rubber doors
**Actual photo cannot be provided due to privacy agreements with Teck Metals, Trail Operations
Indium/indium_1510774363.jpg

Teck Metals - Indium Kiln

2012

Teck Metals - Indium Kiln

Guard-All Centurion Model C48 18’leg
70’x 140’ with 16’ (one 12’) on center bay spacing
  1.       Turn Key (Foundation → Construction)
  2.       5’ block wall
  3.       Custom roof to accommodate existing vertical overhead piping
  4.       Metal roof cladding
  5.       TNR rubber doors
** Actual photo cannot be provided due to privacy agreements with Teck Metals, Trail Operation
bmid_final-3_1510774066.jpg

Black Mountain Irrigation District

2012

Black Mountain Irrigation District

Guard-All Centurion Model C48 18’leg
70’x 120’ with 20’ on center bay spacing
  1. Turn Key (Foundation → Construction)
  2. Fully lined (insulated)
  3. Radiant Heat
  4. Vents, Fans and Control Systems
  5. Overhead and Personnel Doors
 
Purpose: To maintain above freezing temperatures over primary water treatment ponds