Facility upgrade · Rimbey, AB · 2022
Fertilizer plant upgrade for Nutrien Ag Solutions in Rimbey, Alberta
The client
Nutrien Ag Solutions runs a retail fertilizer plant in Rimbey, Alberta that has to be ready for the spring rush. The plant's house bins, spouting, augers and leg were worn out, so Nutrien brought in Pacific Apex Industrial to replace and upgrade the core of the facility in a single planned shutdown.
What we did
Pacific Apex supplied the equipment and materials, managed the project and provided the crew, crane and access equipment. The scope included:
- Six new house bins: four Meridian 1630 and two 1625 hopper bins on skids, with 10" inlets and stainless rack-and-pinion gates
- New 10" hot-dip galvanized spouting, elbowed into the bins with no deadheads, stainless clamp bands and galvanized truss kits on every run over 40 ft
- New 10" metering augers with stainless hoppers and side inspection and clean-out doors
- A new 100 BPH stainless steel jump leg with a new start/stop switch
- Three storage bin reclaim augers replaced, including drives and stainless hoppers
- Loadout conveyor support frame rebuilt
- Inload screw conveyor rebuilt with new flighting, hangers and drive section, plus a new head pulley, shaft and bearings on the inload bucket elevator
- Stainless cable-and-pulley bin level indicators
- A full plant inspection with a written report and repair plan
Every piece of repaired and new equipment was tracked, aligned and commissioned before the plant went back into service.
Built for a corrosive product
Fertilizer eats carbon steel. We specified stainless steel for the leg, hoppers, gates, clamp bands and level cables, and hot-dip galvanized spouting and truss kits, so the new equipment lasts longer between repairs.
Photo gallery






Planning a fertilizer plant upgrade?
We supply the equipment, plan the shutdown and bring the crew, so you deal with one contractor.