GFI pea splitting plant at Zealandia, Saskatchewan, with storage bins and process building

Capital project · Zealandia, SK · 2021–2022

Mechanical and structural installation of a new pea splitting plant

The project

GFI built a new pea splitting and processing plant at Zealandia, Saskatchewan. Pacific Apex delivered the full mechanical and structural installation, taking the plant from an empty site and building to a working line for receiving, cleaning, splitting, sorting and packaging peas.

What we delivered

  • Installation of grain storage, handling and processing equipment, including Buhler airlocks, aspirators and cyclones
  • Seventeen bucket elevator legs, conveyors, spouting and storage bins for receiving, processing, by-products and packaging
  • Aspiration and dust-control ducting throughout the process building
  • Support steel, platforms and catwalks for equipment access
  • Modifications to the pre-engineered steel building, cladding and loading dock by our Structures Division
  • Bagging and sewing line installation for finished product

One team, two divisions

The project drew on both sides of Pacific Apex: Industrial millwrights and CWB-certified welders for the process equipment, and our Structures team for the building work, coordinated as one schedule with the owner, engineers and electrical and controls contractors.

Photo gallery

Building or expanding a processing plant?

We install the equipment, steel and building as one team.